

ASU Almeda Warehouse
Tempe, AZ
This project was a new 50,000 ft2 warehouse tilt building for ASU with a 6” thick slab and 4 lb/yd3 of FiberForce 750 macrofiber. Fibers were specified for temperature and shrinkage control over a vapor barrier and 4” aggregate base course.
Product
FF 750
Volume
50,000 ft2
Owner
Arizona State University
Engineer
Advanced Structural Engineering
Concrete Contractor
Hardrock Concrete Placement Co.
Ready-mix Concrete Supplier
CEMEX