City of El Mirage Wastewater Treatment Plant
El Mirage, AZ
This project is a heavy equipment wash rack drainage system designed to remove dirt, grease, and oil from the wash water prior to it entering the water treatment plant. Team Fishel and FiberForce paired up to value engineer this heavy equipment wash rack slab which would have gone with traditional rebar reinforcement. Instead, Team Fishel and the City of El Mirage poured 5.5 lb/yd3 of FiberForce 750 macrofiber to help with crack control as well as impact and abrasion resistance in the slab.
Product
FF 750
Volume
35′ x 40′ slab on grade
Owner
City of El Mirage
Concrete Contractor
Team Fishel
Ready-mix Concrete Supplier
CalPortland