Project Spotlight
Kingvale Bridge Deck Phase I
- FiberForce 600
- Bridges & Decks
- Infrastructure
- Exterior
Scope of Work
Cal-Trans is rehabbing the I-80 corridor over the Sierra Nevada Mountains. They are repaving the highway and rebuilding bridges to add new lanes. In Phase I, they poured two separate bridge decks roughly 1/4 mile apart. The challenges came from having to do this in the mountains on uneven surfaces, while not blocking the traffic on I-80 as it is the lifeblood of Nevada. The concrete was dosed with FiberForce 600 at one bag per yard. Each bridge deck used roughly 73 yd3 each.
-
Location
Kingvale, CO
-
Date
Ongoing Project
-
Owner
CalTrans
-
Area
-
Volume
150 yd3
-
Engineer
-
General Contractor
Teichert Construction
-
Concrete Contractor
MCM Construction
-
Ready-Mix Concrete Supplier
Hansen Bros. Enterprises
-
Location
Kingvale, CO
-
Date
Ongoing Project
-
Owner
CalTrans
-
Volume
150 yd3
-
General Contractor
Teichert Construction
-
Concrete Contractor
MCM Construction
-
Ready-Mix Concrete Supplier
Hansen Bros. Enterprises
We have not had any complaints about balling since we started using FullForce for bridge decks. We couldn’t be happier with your product.”
Hansen Bros. Enterprises












