Shinhung Global Warehouse

Scope of Work

This project consisted of 6” slab-on-grade with traditional rebar reinforcement, specifically #4 at 12” on centers each way. The concrete contractor was able to eliminate the need for a pump truck and expedite the pour schedule by utilizing FiberForce 750 at 7 yd3 .

  • Location

    Clarksville, TN

  • Date

    December 2021

  • Owner

    Shinhung Global

  • Area

  • Volume

    1,500 yd3

  • Engineer

    Gresham Smith

  • General Contractor

  • Concrete Contractor

  • Ready-Mix Concrete Supplier

    IMI

  • Location

    Clarksville, TN

  • Date

    December 2021

  • Owner

    Shinhung Global

  • Volume

    1,500 yd3

  • Engineer

    Gresham Smith

  • Ready-Mix Concrete Supplier

    IMI