This project involved paving drive lanes and parking spots throughout the Sterling Ranch subdivision using 850 yd3 of concrete with 1 lbs/yd3 of FiberForce 350 for plastic shrinkage reduction. Two days following the placement, the team walked the site and found that there were no cracks to be found, even in the re-entrant corners and radius areas.

  • Location

    Littleton, CO

  • Date

    July 2025

  • Owner

  • Area

  • Volume

    850 yd3

  • Engineer

  • General Contractor

  • Concrete Contractor

    Concrete Curb and Paving