Project Spotlight

TLC Community Center

Scope of Work

FiberForce 350 was used in lieu of 10 gauge welded wire fabric (WWF) in this project consisting of 4” interior slab on grade. The contractor opted to utilize FiberForce 350 to eliminate the cost of WWF and the labor need to place and chair the WWF. FiberForce 350 provided both plastic shrinkage reduction and temperature shrinkage reinforcement at an addition rate of 1 lb/yd3.

  • Location

    Elizabethton, TN

  • Date

    May 2025

  • Owner

    TLC Community Center

  • Area

  • Volume

    40 yd3

  • Engineer

  • General Contractor

  • Concrete Contractor

    Butler Concrete

  • Ready-Mix Concrete Supplier

    SRM